Mansard Design & Planning in Dundee

For Dundee homeowners who need another floor rather than another room, here is how a mansard design and planning service works. Guide price £3,400 to £8,700.

Get a guide price Call 0800 088 6341

What is a mansard design and planning service?

This is the paperwork stage of a mansard, done properly: we measure the house, draw the proposal, argue it through planning, and produce the structural and building regulations drawings a builder can price accurately.

A mansard stands or falls on its planning case. We look at what the council has approved and refused nearby, read its roof extension guidance, and design to it. Once permission is granted, the technical drawings and engineer's calculations go to building control, and you have a fixed design to build from.

2026 guide price in Dundee£3,400 – £8,700Guide only. Fixed quote after survey.

Expect to pay between £3,400 and £8,700 for a mansard design and planning service in Dundee. That is a guide, not a quote: we price each house from a survey and drawings.

Mansard Design & Planning for homes in Dundee

What is included in Dundee?

  • Building regulations drawings and building control submission
  • Structural engineer's calculations and details
  • Measured survey of the house and roof
  • Existing and proposed plans, sections and elevations
  • Review of local planning history and design guidance

What should Dundee homeowners know?

Slate roofs, stone skews and chimneys are characteristic, and planning authorities expect new roof work to respect them.

In Dundee you need planning permission from the council for a mansard in most cases, and a building warrant must be granted by the council's building standards service before work starts. The Party Wall etc. Act does not apply in Scotland; work to shared walls and roofs is governed by title deeds and the law of the tenement.

Where in Dundee?

Free survey in Dundee

Mansard Design & Planning in Dundee: questions

How long does planning permission for a mansard take?

Councils aim to decide householder applications within eight weeks of validation. Allow three to four weeks before that for survey and drawings.

What happens if the mansard is refused?

We read the reasons, and either amend and resubmit or advise on an appeal. A refusal usually points to specific changes, such as a greater set-back or different windows.

Can I use your drawings with another builder?

Yes. The design and planning service is priced on its own and the drawings are yours to build from.

How much does a mansard design and planning service cost in Dundee?

Our 2026 guide price in Dundee is £3,400 to £8,700. You receive a fixed written quote after a free survey.