Mansard Design & Planning in Reading
For Reading homeowners who need another floor rather than another room, here is how a mansard design and planning service works. Guide price £3,900 to £10,000.
What is a mansard design and planning service?
Mansard design and planning is the pre-construction work for a mansard: a measured survey, design drawings, a planning application, structural calculations and a building regulations package. It can be taken on its own before you commit to a builder.
A mansard stands or falls on its planning case. We look at what the council has approved and refused nearby, read its roof extension guidance, and design to it. Once permission is granted, the technical drawings and engineer's calculations go to building control, and you have a fixed design to build from.
Our 2026 guide price for a mansard design and planning service in Reading is £3,900 to £10,000. The exact figure depends on size, structure, finish and how easy the roof is to reach.

What is included in Reading?
- Building regulations drawings and building control submission
- Structural engineer's calculations and details
- Existing and proposed plans, sections and elevations
- Planning application submitted and managed to decision
- Measured survey of the house and roof
What should Reading homeowners know?
Commuter-belt demand makes an extra bedroom valuable, and on terraced streets with low ridges a mansard is often the only way to get full standing height.
In Reading a mansard usually needs planning permission from the local council, because it changes the shape of the roof. A rear mansard on a house can sometimes be designed within permitted development limits; flats, listed buildings and conservation areas always need an application.
Where in Reading?
Free survey in Reading
Mansard Design & Planning in Reading: questions
What happens if the mansard is refused?
We read the reasons, and either amend and resubmit or advise on an appeal. A refusal usually points to specific changes, such as a greater set-back or different windows.
How long does planning permission for a mansard take?
Councils aim to decide householder applications within eight weeks of validation. Allow three to four weeks before that for survey and drawings.
Do I need an architect for a mansard?
You need someone who can design it, get it through planning and produce building regulations drawings. That can be an architect, an architectural technologist or a design-and-build firm with in-house designers.
How much does a mansard design and planning service cost in Reading?
Our 2026 guide price in Reading is £3,900 to £10,000. You receive a fixed written quote after a free survey.
Free survey and fixed written quote
Tell us about your Reading property and we will come back with next steps and a guide price.
Get a guide price Call 0800 088 6341