Short answer: Most mansards need planning permission because they change the shape of the roof. Some rear mansards on houses in England can be built under permitted development; flats, listed buildings and conservation areas always need an application.
When is planning permission needed?
Always for front or double mansards, for any flat or maisonette, for listed buildings, and in conservation areas, national parks and similar designated land. Also wherever the council has removed permitted development rights.
When can a mansard be permitted development?
In England, a rear roof enlargement on a house can be permitted development if the added volume is no more than 40 cubic metres on a terraced house or 50 on any other house, it does not rise above the ridge, materials are similar, and it is set back from the eaves where practicable. Many mansards exceed the volume limit.
What do planners look at?
The slope angle, commonly no steeper than 70 to 72 degrees; the set-back behind the parapet or eaves; dormer size and alignment; materials; party walls and chimneys; and what else exists on the street.
How long does it take?
Councils aim to decide householder applications in eight weeks from validation. A pre-application enquiry beforehand adds a few weeks but reduces the risk of refusal on sensitive sites.
What about Scotland, Wales and Northern Ireland?
Each nation has its own permitted development rules, and mansards will normally need a planning application in all three. Scotland also requires a building warrant before work starts.